Campton Hills Asphalt Contractor

Shamblin Paving is a family-owned asphalt contractor serving Campton Hills homes, farms, and businesses. Working out of nearby Sugar Grove for more than 20 years, we handle the full range of asphalt work across the western suburbs, from driveway paving and parking lot installation to sealcoating, striping, crack sealing, and scheduled maintenance programs.
Campton Hills is Kane County’s newest village, incorporated in 2007 across roughly 17 square miles of Campton and Plato townships, including the historic hamlet of Wasco along Route 64. Its 11,000 or so residents chose incorporation largely to protect the area’s semi-rural character, and it shows: acreage lots, equestrian properties, wooded subdivisions, and some of the longest residential driveways in the county. Long driveways mean more asphalt exposed to deep frost, clay soils, and freeze-thaw cycling, which makes proper construction and regular sealcoating matter even more here than in denser towns.
Why Campton Hills Property Owners Choose Shamblin Paving
We are a local, family-owned company based in Sugar Grove, a short drive down the road, not a franchise or a crew passing through. Since 2006 we have completed hundreds of paving and sealcoating projects across Kane, DuPage, Kendall, and Will counties, including plenty of large-lot and rural work like the properties that define Campton Hills.
- Free Estimates and Upfront Pricing. We walk the full length of the project with you, explain the scope, and give you a firm number before work begins. No surprises.
- 20+ Years of Local Experience. Two decades on Kane County ground taught us how its soils, drainage, and compressed season treat asphalt, and we build accordingly.
- Minimal Disruption. Crews work around your household schedule, business hours, or barn routine and keep the timeline tight.
- Commercial and Residential. A winding 800-foot driveway gets the same base prep, grading, and compaction standards as a 200-space commercial lot.
Asphalt Services in Bristol
Driveway Paving
Asphalt costs 30-50% less than concrete, a difference that adds up quickly on the long driveways common in Campton Hills, and lasts 20-30 years with sealcoating. Most driveways, including gravel-to-asphalt conversions, are paved in a day and drivable within 5-7 days.
Driveway Sealcoating
Sealcoating defends asphalt against UV, water, oil, and winter road salt. On a 2-4 year cycle it keeps long runs of pavement flexible and stops the small cracks that grow into major repairs.
Commercial Paving
In this climate, a hairline crack becomes a pothole in a single winter once water gets in and freezes. Timely crack sealing and patching is the cheapest insurance there is; the Asphalt Institute figures every preventive dollar saves you future costs down the line.
Parking Lot Sealcoating
Unprotected lots oxidize, fade, and crack within 3-5 years under sun, vehicle fluids, and freeze-thaw stress. We sealcoat commercial surfaces every 2-3 years, phasing the work so the property stays usable throughout.
Parking Lot Striping
Worn markings create safety risks and ADA compliance exposure, with the Village of Campton Hills enforcing local code alongside federal accessibility guidelines. We stripe stalls, fire lanes, directional arrows, handicap spaces, and crosswalks.
Parking Lot Maintenance
From churches and schools to the shops around Wasco, we install, overlay, and replace lots throughout the village. The National Asphalt Pavement Association ties 90% of premature failures to drainage or base problems, so every project starts with what is under the surface.


What You Should Know About Paving in Bristol
The village’s countryside setting shapes how asphalt performs here, and a few local factors are worth knowing before a project starts.
Soil and Drainage. The ground across Campton and Plato townships is largely silty clay loam that holds water and swells when saturated, pressing on pavement from below. The headwaters of Ferson Creek rise in this area, and properties near its branches and the village’s wetland pockets can drain slowly after storms. On acreage lots, where driveways often cross natural low spots, subbase depth and drainage grading decide how long the pavement lasts. Careful site planning also matters around the private wells and septic fields most properties here rely on, and our crews grade and route accordingly.
Frost Line. Frost in northern Illinois reaches about 36 inches, among the deepest in the state. Moisture trapped in a poorly compacted or saturated base freezes, expands, and heaves the pavement, then drops it unevenly in the thaw. Over the length of a long rural driveway, that cycle shows up fast as cracking and potholes.
Seasonal Timing. The Campton Hills paving season generally runs late April through mid-November. Hot-mix asphalt needs steady ambient temperatures above 50 degrees Fahrenheit and rising, so fall projects should be scheduled with enough cure time before the first hard freeze, typically late October or early November.
Permits. Since incorporating in 2007, the Village of Campton Hills has administered its own building and zoning requirements, and permits for new driveways, widening, and commercial paving run through the village rather than the county. Shamblin Paving coordinates the permitting on our Campton Hills projects so the process never slows you down.
Ready to Get Started?
Whether your property sits along the Route 64 corridor through Wasco, off Burlington Road or LaFox Road, or down a private lane among the horse farms, our crews are minutes away and can typically schedule an estimate within a few business days.
Call 630-448-4411 or fill out the estimate form and we will come walk the property with you. Clear options, honest answers, and a no-obligation quote.
Call 630-448-4411 For a Free Estimate
